E

EVR Ltd in Southampton

Southampton·Solar Installation
ResidentialCommercial

18+ yrs

Experience

60 km

Service radius

2-10

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About EVR Ltd

MCS-certified renewable energy installer serving Southampton and Hampshire since 2008

Southampton, SO51 6DX

Southampton SO51 6DX

Services Offered

Solar InstallationBattery StorageEV ChargingMaintenance

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

MCSRECC

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

SouthamptonRomseyEastleighWinchesterFareham

Customer Reviews

No reviews yet. Be the first to review EVR Ltd!

Write a Review

Frequently Asked Questions

How do I get a quote from EVR Ltd?

You can request a quote through the form on this page or contact EVR Ltd directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does EVR Ltd serve?

EVR Ltd is based in Southampton and serves within a 60 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does EVR Ltd hold?

This profile lists the following reported certifications: MCS, RECC. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does EVR Ltd offer?

Warranty terms are not documented on this profile. Ask EVR Ltd for the equipment, workmanship, exclusions, transfer, and claim terms in writing.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask EVR Ltd for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does EVR Ltd handle permits and paperwork?

The exact scope is not verified on this profile. Ask EVR Ltd which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Social Media

Request a Quote

Business Details

Founded2008
Employees2-10
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from EVR Ltd

Send your project details to request follow-up from EVR Ltd. Response timing and consultation terms are set by the company.

For EVR Ltd

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.