E

Eco2Solar in Worcester

Worcester·Solar Installation
ResidentialCommercialIndustrial

19+ yrs

Experience

100 km

Service radius

51-200

Employees

Profile information

83%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile0%

About Eco2Solar

One of the UK's largest solar PV installers, based in Worcestershire since 2007

Worcester, DY11 7SL

Worcester DY11 7SL

Services Offered

Solar InstallationBattery StorageMaintenanceEnergy Audit

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

MCSNICEICISO 9001

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

12yr

Inverter Warranty

10yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

WorcesterKidderminsterBromsgroveBirminghamRedditchDroitwich

Customer Reviews

No reviews yet. Be the first to review Eco2Solar!

Write a Review

Frequently Asked Questions

How do I get a quote from Eco2Solar?

You can request a quote through the form on this page or contact Eco2Solar directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Eco2Solar serve?

Eco2Solar is based in Worcester and serves within a 100 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Eco2Solar hold?

This profile lists the following reported certifications: MCS, NICEIC, ISO 9001. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does Eco2Solar offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Eco2Solar for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Eco2Solar for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Eco2Solar handle permits and paperwork?

The exact scope is not verified on this profile. Ask Eco2Solar which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Business Details

Founded2007
Employees51-200
Profile StatusUnclaimed
Profile Complete83%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Eco2Solar

Send your project details to request follow-up from Eco2Solar. Response timing and consultation terms are set by the company.

For Eco2Solar

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
E

Eco2Solar

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.