E

E-Verve Energy in Liverpool

Liverpool·Solar Installation
ResidentialCommercial

8+ yrs

Experience

80 km

Service radius

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About E-Verve Energy

Award-winning North West solar, battery storage, and EV charging installer with over 20,000 installations across the UK

Liverpool, WA9 4TR

Liverpool WA9 4TR

Services Offered

Solar InstallationBattery StorageEV Charging

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

MCSNAPITRECCOZEV

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

10yr

Inverter Warranty

2yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

LiverpoolSt HelensWarringtonWirralWidnes

Customer Reviews

No reviews yet. Be the first to review E-Verve Energy!

Write a Review

Frequently Asked Questions

How do I get a quote from E-Verve Energy?

You can request a quote through the form on this page or contact E-Verve Energy directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does E-Verve Energy serve?

E-Verve Energy is based in Liverpool and serves within a 80 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does E-Verve Energy hold?

This profile lists the following reported certifications: MCS, NAPIT, RECC, OZEV. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does E-Verve Energy offer?

This profile reports 25-year panel coverage and 2-year workmanship coverage. Ask E-Verve Energy for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask E-Verve Energy for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does E-Verve Energy handle permits and paperwork?

The exact scope is not verified on this profile. Ask E-Verve Energy which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Social Media

Request a Quote

Business Details

Founded2018
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from E-Verve Energy

Send your project details to request follow-up from E-Verve Energy. Response timing and consultation terms are set by the company.

For E-Verve Energy

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
E

E-Verve Energy

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.