DLB Solar & Renewables in Gloucester
50 km
Service radius
2-10
Employees
Profile information
About DLB Solar & Renewables
NICEIC registered solar installation and maintenance specialists serving Cheltenham and Gloucestershire
Gloucester, GL50 1SX
Gloucester GL50 1SX
Services Offered
Reported Certifications
These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.
Reported Warranty Coverage
Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.
25yr
Panel Warranty
12yr
Inverter Warranty
10yr
Installation Warranty
Questions to Ask About Installation
Initial Consultation
Ask whether a site assessment is offered, what it covers, and whether it has a fee.
System Design
Request a design showing the proposed equipment, layout, assumptions, and itemized costs.
Permitting & Approval
Confirm who handles permits, inspections, and utility interconnection, and which fees are included.
Installation
Verify the installation team’s licenses, relevant certifications, and insurance.
Commissioning & Handover
Confirm the testing records, monitoring access, warranty registration, and support included in the handover.
Service Areas
Customer Reviews
No reviews yet. Be the first to review DLB Solar & Renewables!
Frequently Asked Questions
How do I get a quote from DLB Solar & Renewables?
You can request a quote through the form on this page or contact DLB Solar & Renewables directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.
What areas does DLB Solar & Renewables serve?
DLB Solar & Renewables is based in Gloucester and serves within a 50 km radius. Check the Service Areas section above for a complete list of locations.
What certifications does DLB Solar & Renewables hold?
This profile lists the following reported certifications: NICEIC, BPEC. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.
What warranty does DLB Solar & Renewables offer?
This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask DLB Solar & Renewables for current written terms and exclusions.
How long does installation take?
The timeline is project- and jurisdiction-specific. Ask DLB Solar & Renewables for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.
Does DLB Solar & Renewables handle permits and paperwork?
The exact scope is not verified on this profile. Ask DLB Solar & Renewables which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.
Business Details
About this profile
The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.
Similar Installers
Request a Quote from DLB Solar & Renewables
Send your project details to request follow-up from DLB Solar & Renewables. Response timing and consultation terms are set by the company.
For DLB Solar & Renewables
Claim Your Free Profile
Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.
DLB Solar & Renewables