DES Renewable Energy in Southampton
10+ yrs
Experience
80 km
Service radius
11-50
Employees
Profile information
About DES Renewable Energy
MCS and NAPIT-certified solar PV and battery storage installer serving Southampton and the South of England
Southampton, BH21 7BX
Southampton BH21 7BX
Services Offered
Reported Certifications
These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.
Questions to Ask About Installation
Initial Consultation
Ask whether a site assessment is offered, what it covers, and whether it has a fee.
System Design
Request a design showing the proposed equipment, layout, assumptions, and itemized costs.
Permitting & Approval
Confirm who handles permits, inspections, and utility interconnection, and which fees are included.
Installation
Verify the installation team’s licenses, relevant certifications, and insurance.
Commissioning & Handover
Confirm the testing records, monitoring access, warranty registration, and support included in the handover.
Service Areas
Customer Reviews
No reviews yet. Be the first to review DES Renewable Energy!
Frequently Asked Questions
How do I get a quote from DES Renewable Energy?
You can request a quote through the form on this page or contact DES Renewable Energy directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.
What areas does DES Renewable Energy serve?
DES Renewable Energy is based in Southampton and serves within a 80 km radius. Check the Service Areas section above for a complete list of locations.
What certifications does DES Renewable Energy hold?
This profile lists the following reported certifications: MCS, NAPIT, RECC. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.
What warranty does DES Renewable Energy offer?
Warranty terms are not documented on this profile. Ask DES Renewable Energy for the equipment, workmanship, exclusions, transfer, and claim terms in writing.
How long does installation take?
The timeline is project- and jurisdiction-specific. Ask DES Renewable Energy for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.
Does DES Renewable Energy handle permits and paperwork?
The exact scope is not verified on this profile. Ask DES Renewable Energy which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.
Contact Information
Request a QuoteBusiness Details
About this profile
The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.
Similar Installers
Request a Quote from DES Renewable Energy
Send your project details to request follow-up from DES Renewable Energy. Response timing and consultation terms are set by the company.
For DES Renewable Energy
Claim Your Free Profile
Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.
DES Renewable Energy