Cozy Home Solutions in Oxford
7+ yrs
Experience
80 km
Service radius
11-50
Employees
Profile information
About Cozy Home Solutions
Insulation and solar specialists serving Oxford and the UK since 2019 — MCS, TrustMark, and PAS 2030 accredited
Oxford, OX4 6FE
Oxford OX4 6FE
Services Offered
Reported Certifications
These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.
Reported Warranty Coverage
Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.
20yr
Panel Warranty
20yr
Inverter Warranty
10yr
Installation Warranty
Questions to Ask About Installation
Initial Consultation
Ask whether a site assessment is offered, what it covers, and whether it has a fee.
System Design
Request a design showing the proposed equipment, layout, assumptions, and itemized costs.
Permitting & Approval
Confirm who handles permits, inspections, and utility interconnection, and which fees are included.
Installation
Verify the installation team’s licenses, relevant certifications, and insurance.
Commissioning & Handover
Confirm the testing records, monitoring access, warranty registration, and support included in the handover.
Service Areas
Customer Reviews
No reviews yet. Be the first to review Cozy Home Solutions!
Frequently Asked Questions
How do I get a quote from Cozy Home Solutions?
You can request a quote through the form on this page or contact Cozy Home Solutions directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.
What areas does Cozy Home Solutions serve?
Cozy Home Solutions is based in Oxford and serves within a 80 km radius. Check the Service Areas section above for a complete list of locations.
What certifications does Cozy Home Solutions hold?
This profile lists the following reported certifications: MCS, TrustMark. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.
What warranty does Cozy Home Solutions offer?
This profile reports 20-year panel coverage and 10-year workmanship coverage. Ask Cozy Home Solutions for current written terms and exclusions.
How long does installation take?
The timeline is project- and jurisdiction-specific. Ask Cozy Home Solutions for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.
Does Cozy Home Solutions handle permits and paperwork?
The exact scope is not verified on this profile. Ask Cozy Home Solutions which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.
Contact Information
Request a QuoteBusiness Details
About this profile
The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.
Similar Installers
Request a Quote from Cozy Home Solutions
Send your project details to request follow-up from Cozy Home Solutions. Response timing and consultation terms are set by the company.
For Cozy Home Solutions
Claim Your Free Profile
Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.
Cozy Home Solutions