C

Core7 in Swindon

Swindon·Solar Installation
ResidentialCommercialIndustrial
0

50 km

Service radius

1-10

Employees

Profile information

83%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile0%

About Core7

NICEIC and MCS certified solar, battery storage, and EV charger installers based in Swindon, Wiltshire

Swindon,

Swindon

Services Offered

Solar InstallationBattery StorageEV Charging

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

MCSNICEICRECC

Reported Equipment Brands

Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.

Batteries

Tesla Powerwall

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

12yr

Inverter Warranty

10yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

SwindonWiltshireBristolBathChippenhamCirencester

Customer Reviews

No reviews yet. Be the first to review Core7!

Write a Review

Frequently Asked Questions

How do I get a quote from Core7?

You can request a quote through the form on this page or contact Core7 directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Core7 serve?

Core7 is based in Swindon and serves within a 50 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Core7 hold?

This profile lists the following reported certifications: MCS, NICEIC, RECC. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does Core7 offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Core7 for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Core7 for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Core7 handle permits and paperwork?

The exact scope is not verified on this profile. Ask Core7 which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Request a Quote

Business Details

0
Employees1-10
Profile StatusUnclaimed
Profile Complete83%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Core7

Send your project details to request follow-up from Core7. Response timing and consultation terms are set by the company.

For Core7

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.