C

Connect Electric in Manchester

Manchester·Solar Installation
Residential

17+ yrs

Experience

40 km

Service radius

2-10

Employees

Profile information

83%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile0%

About Connect Electric

Which? Trusted Trader with over 15 years in solar and 25 years in electrical contracting across Manchester

Manchester, M45 7SY

Manchester M45 7SY

Services Offered

Solar InstallationBattery StorageMaintenance

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

MCSNAPITTrustMark

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

10yr

Inverter Warranty

10yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

ManchesterWhitefieldBuryPrestwichRadcliffeSalford

Customer Reviews

No reviews yet. Be the first to review Connect Electric!

Write a Review

Frequently Asked Questions

How do I get a quote from Connect Electric?

You can request a quote through the form on this page or contact Connect Electric directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Connect Electric serve?

Connect Electric is based in Manchester and serves within a 40 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Connect Electric hold?

This profile lists the following reported certifications: MCS, NAPIT, TrustMark. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does Connect Electric offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Connect Electric for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Connect Electric for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Connect Electric handle permits and paperwork?

The exact scope is not verified on this profile. Ask Connect Electric which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Business Details

Founded2009
Employees2-10
Profile StatusUnclaimed
Profile Complete83%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Connect Electric

Send your project details to request follow-up from Connect Electric. Response timing and consultation terms are set by the company.

For Connect Electric

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
C

Connect Electric

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.