CME Contractors Ltd in Cheltenham
30 km
Service radius
1-10
Employees
Profile information
About CME Contractors Ltd
MCS and RECC accredited solar PV and EV charging specialists in Cheltenham, Gloucestershire
Cheltenham, GL52 6JL
Cheltenham GL52 6JL
Services Offered
Reported Certifications
These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.
Reported Warranty Coverage
Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.
25yr
Panel Warranty
12yr
Inverter Warranty
10yr
Installation Warranty
Questions to Ask About Installation
Initial Consultation
Ask whether a site assessment is offered, what it covers, and whether it has a fee.
System Design
Request a design showing the proposed equipment, layout, assumptions, and itemized costs.
Permitting & Approval
Confirm who handles permits, inspections, and utility interconnection, and which fees are included.
Installation
Verify the installation team’s licenses, relevant certifications, and insurance.
Commissioning & Handover
Confirm the testing records, monitoring access, warranty registration, and support included in the handover.
Service Areas
Customer Reviews
No reviews yet. Be the first to review CME Contractors Ltd!
Frequently Asked Questions
How do I get a quote from CME Contractors Ltd?
You can request a quote through the form on this page or contact CME Contractors Ltd directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.
What areas does CME Contractors Ltd serve?
CME Contractors Ltd is based in Cheltenham and serves within a 30 km radius. Check the Service Areas section above for a complete list of locations.
What certifications does CME Contractors Ltd hold?
This profile lists the following reported certifications: MCS, RECC, NAPIT. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.
What warranty does CME Contractors Ltd offer?
This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask CME Contractors Ltd for current written terms and exclusions.
How long does installation take?
The timeline is project- and jurisdiction-specific. Ask CME Contractors Ltd for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.
Does CME Contractors Ltd handle permits and paperwork?
The exact scope is not verified on this profile. Ask CME Contractors Ltd which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.
Business Details
About this profile
The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.
Similar Installers
Request a Quote from CME Contractors Ltd
Send your project details to request follow-up from CME Contractors Ltd. Response timing and consultation terms are set by the company.
For CME Contractors Ltd
Claim Your Free Profile
Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.
CME Contractors Ltd