C

Carter Electrical Installation in Reading

Reading·Solar Installation
ResidentialCommercial

18+ yrs

Experience

50 km

Service radius

2-10

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About Carter Electrical Installation

Family-run electrical and solar specialists in Reading — certified Tesla Powerwall installer since 2010

Reading, RG1 7XS

Reading RG1 7XS

Services Offered

Solar InstallationBattery StorageEV ChargingMaintenance

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

MCSNICEIC

Reported Equipment Brands

Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.

Panels

Various MCS-certified

Inverters

SolarEdgeGrowattGivEnergy

Batteries

Tesla PowerwallPowervaultGivEnergy

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

12yr

Inverter Warranty

5yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

ReadingWokinghamBracknellWoodleyCaversham

Customer Reviews

No reviews yet. Be the first to review Carter Electrical Installation!

Write a Review

Frequently Asked Questions

How do I get a quote from Carter Electrical Installation?

You can request a quote through the form on this page or contact Carter Electrical Installation directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Carter Electrical Installation serve?

Carter Electrical Installation is based in Reading and serves within a 50 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Carter Electrical Installation hold?

This profile lists the following reported certifications: MCS, NICEIC. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does Carter Electrical Installation offer?

This profile reports 25-year panel coverage and 5-year workmanship coverage. Ask Carter Electrical Installation for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Carter Electrical Installation for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Carter Electrical Installation handle permits and paperwork?

The exact scope is not verified on this profile. Ask Carter Electrical Installation which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Social Media

Request a Quote

Business Details

Founded2008
Employees2-10
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Carter Electrical Installation

Send your project details to request follow-up from Carter Electrical Installation. Response timing and consultation terms are set by the company.

For Carter Electrical Installation

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
C

Carter Electrical Installation

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.