Cambridge Renewables in Cambridge
4+ yrs
Experience
60 km
Service radius
1-10
Employees
Profile information
About Cambridge Renewables
MCS and RECC accredited solar, battery storage, and solar panel supply specialist serving Cambridge and East Anglia
Cambridge,
Cambridge
Services Offered
Reported Certifications
These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.
Reported Warranty Coverage
Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.
25yr
Panel Warranty
12yr
Inverter Warranty
10yr
Installation Warranty
Questions to Ask About Installation
Initial Consultation
Ask whether a site assessment is offered, what it covers, and whether it has a fee.
System Design
Request a design showing the proposed equipment, layout, assumptions, and itemized costs.
Permitting & Approval
Confirm who handles permits, inspections, and utility interconnection, and which fees are included.
Installation
Verify the installation team’s licenses, relevant certifications, and insurance.
Commissioning & Handover
Confirm the testing records, monitoring access, warranty registration, and support included in the handover.
Service Areas
Customer Reviews
No reviews yet. Be the first to review Cambridge Renewables!
Frequently Asked Questions
How do I get a quote from Cambridge Renewables?
You can request a quote through the form on this page or contact Cambridge Renewables directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.
What areas does Cambridge Renewables serve?
Cambridge Renewables is based in Cambridge and serves within a 60 km radius. Check the Service Areas section above for a complete list of locations.
What certifications does Cambridge Renewables hold?
This profile lists the following reported certifications: MCS, RECC. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.
What warranty does Cambridge Renewables offer?
This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Cambridge Renewables for current written terms and exclusions.
How long does installation take?
The timeline is project- and jurisdiction-specific. Ask Cambridge Renewables for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.
Does Cambridge Renewables handle permits and paperwork?
The exact scope is not verified on this profile. Ask Cambridge Renewables which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.
Contact Information
Request a QuoteBusiness Details
About this profile
The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.
Similar Installers
Request a Quote from Cambridge Renewables
Send your project details to request follow-up from Cambridge Renewables. Response timing and consultation terms are set by the company.
For Cambridge Renewables
Claim Your Free Profile
Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.
Cambridge Renewables