B

Bright Spark Energy in Portsmouth

Portsmouth·Solar Installation
ResidentialCommercial

7+ yrs

Experience

100 km

Service radius

11-50

Employees

Profile information

83%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile0%

About Bright Spark Energy

Renewable energy specialists serving Portsmouth with solar panel, battery storage, and EV charging installations

Portsmouth, BN17 7TL

Portsmouth BN17 7TL

Services Offered

Solar InstallationBattery StorageEV ChargingMonitoring

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

MCSNAPITTrustMark

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

PortsmouthSouthamptonBrightonChichesterHampshireWest Sussex

Customer Reviews

No reviews yet. Be the first to review Bright Spark Energy!

Write a Review

Frequently Asked Questions

How do I get a quote from Bright Spark Energy?

You can request a quote through the form on this page or contact Bright Spark Energy directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Bright Spark Energy serve?

Bright Spark Energy is based in Portsmouth and serves within a 100 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Bright Spark Energy hold?

This profile lists the following reported certifications: MCS, NAPIT, TrustMark. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does Bright Spark Energy offer?

Warranty terms are not documented on this profile. Ask Bright Spark Energy for the equipment, workmanship, exclusions, transfer, and claim terms in writing.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Bright Spark Energy for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Bright Spark Energy handle permits and paperwork?

The exact scope is not verified on this profile. Ask Bright Spark Energy which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Business Details

Founded2019
Employees11-50
Profile StatusUnclaimed
Profile Complete83%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Bright Spark Energy

Send your project details to request follow-up from Bright Spark Energy. Response timing and consultation terms are set by the company.

For Bright Spark Energy

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
B

Bright Spark Energy

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.