ARD Solar Energy in Gloucester
80 km
Service radius
2-10
Employees
Profile information
About ARD Solar Energy
NAPIT and MCS registered family-run solar PV installers covering Gloucester, Cheltenham, and the South West
Gloucester, GL1 1JS
Gloucester GL1 1JS
Services Offered
Reported Certifications
These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.
Reported Warranty Coverage
Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.
25yr
Panel Warranty
12yr
Inverter Warranty
10yr
Installation Warranty
Questions to Ask About Installation
Initial Consultation
Ask whether a site assessment is offered, what it covers, and whether it has a fee.
System Design
Request a design showing the proposed equipment, layout, assumptions, and itemized costs.
Permitting & Approval
Confirm who handles permits, inspections, and utility interconnection, and which fees are included.
Installation
Verify the installation team’s licenses, relevant certifications, and insurance.
Commissioning & Handover
Confirm the testing records, monitoring access, warranty registration, and support included in the handover.
Service Areas
Customer Reviews
No reviews yet. Be the first to review ARD Solar Energy!
Frequently Asked Questions
How do I get a quote from ARD Solar Energy?
You can request a quote through the form on this page or contact ARD Solar Energy directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.
What areas does ARD Solar Energy serve?
ARD Solar Energy is based in Gloucester and serves within a 80 km radius. Check the Service Areas section above for a complete list of locations.
What certifications does ARD Solar Energy hold?
This profile lists the following reported certifications: MCS, NAPIT, REAL. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.
What warranty does ARD Solar Energy offer?
This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask ARD Solar Energy for current written terms and exclusions.
How long does installation take?
The timeline is project- and jurisdiction-specific. Ask ARD Solar Energy for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.
Does ARD Solar Energy handle permits and paperwork?
The exact scope is not verified on this profile. Ask ARD Solar Energy which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.
Business Details
About this profile
The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.
Similar Installers
Request a Quote from ARD Solar Energy
Send your project details to request follow-up from ARD Solar Energy. Response timing and consultation terms are set by the company.
For ARD Solar Energy
Claim Your Free Profile
Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.
ARD Solar Energy