A

AJ Taylor Electrical Contractors in Brighton

Brighton·Solar Installation
ResidentialCommercial

43+ yrs

Experience

60 km

Service radius

11-50

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About AJ Taylor Electrical Contractors

Established Brighton electrical contractors and solar PV specialists with over 40 years of experience

Brighton, BN2 4AW

Brighton BN2 4AW

Services Offered

Solar InstallationBattery StorageEV ChargingMaintenanceEnergy Audit

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

MCSNICEICTesla Certified

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

BrightonHoveLewesWorthingEastbourneCrawley

Customer Reviews

No reviews yet. Be the first to review AJ Taylor Electrical Contractors!

Write a Review

Frequently Asked Questions

How do I get a quote from AJ Taylor Electrical Contractors?

You can request a quote through the form on this page or contact AJ Taylor Electrical Contractors directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does AJ Taylor Electrical Contractors serve?

AJ Taylor Electrical Contractors is based in Brighton and serves within a 60 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does AJ Taylor Electrical Contractors hold?

This profile lists the following reported certifications: MCS, NICEIC, Tesla Certified. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does AJ Taylor Electrical Contractors offer?

Warranty terms are not documented on this profile. Ask AJ Taylor Electrical Contractors for the equipment, workmanship, exclusions, transfer, and claim terms in writing.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask AJ Taylor Electrical Contractors for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does AJ Taylor Electrical Contractors handle permits and paperwork?

The exact scope is not verified on this profile. Ask AJ Taylor Electrical Contractors which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Business Details

Founded1983
Employees11-50
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from AJ Taylor Electrical Contractors

Send your project details to request follow-up from AJ Taylor Electrical Contractors. Response timing and consultation terms are set by the company.

For AJ Taylor Electrical Contractors

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
A

AJ Taylor Electrical Contractors

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.