AES Solar in Edinburgh
47+ yrs
Experience
100 km
Service radius
Profile information
About AES Solar
Scotland's longest-established solar company, founded in 1979, with an Edinburgh office and Queen's Award for Enterprise
Edinburgh, EH7 4AW
Edinburgh EH7 4AW
Services Offered
Reported Certifications
These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.
Reported Warranty Coverage
Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.
25yr
Panel Warranty
10yr
Installation Warranty
Questions to Ask About Installation
Initial Consultation
Ask whether a site assessment is offered, what it covers, and whether it has a fee.
System Design
Request a design showing the proposed equipment, layout, assumptions, and itemized costs.
Permitting & Approval
Confirm who handles permits, inspections, and utility interconnection, and which fees are included.
Installation
Verify the installation team’s licenses, relevant certifications, and insurance.
Commissioning & Handover
Confirm the testing records, monitoring access, warranty registration, and support included in the handover.
Service Areas
Customer Reviews
No reviews yet. Be the first to review AES Solar!
Frequently Asked Questions
How do I get a quote from AES Solar?
You can request a quote through the form on this page or contact AES Solar directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.
What areas does AES Solar serve?
AES Solar is based in Edinburgh and serves within a 100 km radius. Check the Service Areas section above for a complete list of locations.
What certifications does AES Solar hold?
This profile lists the following reported certifications: MCS, RECC, Queen's Award for Enterprise. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.
What warranty does AES Solar offer?
This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask AES Solar for current written terms and exclusions.
How long does installation take?
The timeline is project- and jurisdiction-specific. Ask AES Solar for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.
Does AES Solar handle permits and paperwork?
The exact scope is not verified on this profile. Ask AES Solar which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.
Contact Information
Request a QuoteBusiness Details
About this profile
The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.
Similar Installers
Request a Quote from AES Solar
Send your project details to request follow-up from AES Solar. Response timing and consultation terms are set by the company.
For AES Solar
Claim Your Free Profile
Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.
AES Solar