3S Northampton Ltd in Northampton
60 km
Service radius
11-50
Employees
Profile information
About 3S Northampton Ltd
Established electrical contractor and commercial solar PV installer with 30 years of experience in Northampton
Northampton, NN5 5AX
Northampton NN5 5AX
Services Offered
Reported Certifications
These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.
Reported Warranty Coverage
Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.
25yr
Panel Warranty
12yr
Inverter Warranty
10yr
Installation Warranty
Questions to Ask About Installation
Initial Consultation
Ask whether a site assessment is offered, what it covers, and whether it has a fee.
System Design
Request a design showing the proposed equipment, layout, assumptions, and itemized costs.
Permitting & Approval
Confirm who handles permits, inspections, and utility interconnection, and which fees are included.
Installation
Verify the installation team’s licenses, relevant certifications, and insurance.
Commissioning & Handover
Confirm the testing records, monitoring access, warranty registration, and support included in the handover.
Service Areas
Customer Reviews
No reviews yet. Be the first to review 3S Northampton Ltd!
Frequently Asked Questions
How do I get a quote from 3S Northampton Ltd?
You can request a quote through the form on this page or contact 3S Northampton Ltd directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.
What areas does 3S Northampton Ltd serve?
3S Northampton Ltd is based in Northampton and serves within a 60 km radius. Check the Service Areas section above for a complete list of locations.
What certifications does 3S Northampton Ltd hold?
This profile lists the following reported certifications: MCS. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.
What warranty does 3S Northampton Ltd offer?
This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask 3S Northampton Ltd for current written terms and exclusions.
How long does installation take?
The timeline is project- and jurisdiction-specific. Ask 3S Northampton Ltd for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.
Does 3S Northampton Ltd handle permits and paperwork?
The exact scope is not verified on this profile. Ask 3S Northampton Ltd which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.
Business Details
About this profile
The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.
Similar Installers
Request a Quote from 3S Northampton Ltd
Send your project details to request follow-up from 3S Northampton Ltd. Response timing and consultation terms are set by the company.
For 3S Northampton Ltd
Claim Your Free Profile
Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.
3S Northampton Ltd