Y

YSG Solar in New York

New York, New York·Solar Installation
ResidentialCommercial

16+ yrs

Experience

80 km

Service radius

11-50

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About YSG Solar

Manhattan-based solar development company specializing in flat-roof and pitched-roof installations since 2010

New York, New York 10016

New York, New York 10016

Services Offered

Solar InstallationSolar DesignMaintenanceMonitoringGrid Connection

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

12yr

Inverter Warranty

10yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

Manhattan, New YorkBrooklyn, New YorkQueens, New YorkBronx, New YorkStaten Island, New York

Customer Reviews

No reviews yet. Be the first to review YSG Solar!

Write a Review

Frequently Asked Questions

How do I get a quote from YSG Solar?

You can request a quote through the form on this page or contact YSG Solar directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does YSG Solar serve?

YSG Solar is based in New York and serves within a 80 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does YSG Solar hold?

This profile does not list independently verified certifications. Ask YSG Solar for current license, insurance, and credential details, then confirm them with the relevant authority.

What warranty does YSG Solar offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask YSG Solar for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask YSG Solar for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does YSG Solar handle permits and paperwork?

The exact scope is not verified on this profile. Ask YSG Solar which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Social Media

Request a Quote

Business Details

Founded2010
Employees11-50
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from YSG Solar

Send your project details to request follow-up from YSG Solar. Response timing and consultation terms are set by the company.

For YSG Solar

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
Y

YSG Solar

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.