Y

Yes Solar Solutions in Durham

Durham, North Carolina·Solar Installation
ResidentialCommercial

17+ yrs

Experience

2500+

Projects

120 km

Service radius

11-50

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About Yes Solar Solutions

North Carolina's only NABCEP-accredited solar company — over 2,500 systems installed since 2009

Durham, North Carolina 27513

Durham, North Carolina 27513

Services Offered

Solar InstallationBattery StorageEV ChargingMaintenance

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

NABCEP Accredited CompanyTesla Powerwall CertifiedREC Certified InstallerSolarEdge Preferred PartnerLicensed General Contractor NC/SCLicensed Electrical Contractor NC/SC

Reported Equipment Brands

Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.

Panels

RECSunPower

Inverters

EnphaseSolarEdge

Batteries

Tesla Powerwall

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

25yr

Inverter Warranty

10yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

Durham, North CarolinaCary, North CarolinaRaleigh, North CarolinaChapel Hill, North CarolinaApex, North Carolina

Customer Reviews

No reviews yet. Be the first to review Yes Solar Solutions!

Write a Review

Frequently Asked Questions

How do I get a quote from Yes Solar Solutions?

You can request a quote through the form on this page or contact Yes Solar Solutions directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Yes Solar Solutions serve?

Yes Solar Solutions is based in Durham and serves within a 120 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Yes Solar Solutions hold?

This profile lists the following reported certifications: NABCEP Accredited Company, Tesla Powerwall Certified, REC Certified Installer, SolarEdge Preferred Partner, Licensed General Contractor NC/SC, Licensed Electrical Contractor NC/SC. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does Yes Solar Solutions offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Yes Solar Solutions for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Yes Solar Solutions for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Yes Solar Solutions handle permits and paperwork?

The exact scope is not verified on this profile. Ask Yes Solar Solutions which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Social Media

Request a Quote

Business Details

Founded2009
Employees11-50
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Yes Solar Solutions

Send your project details to request follow-up from Yes Solar Solutions. Response timing and consultation terms are set by the company.

For Yes Solar Solutions

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
Y

Yes Solar Solutions

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.