W

Wolf River Electric in Minneapolis

Minneapolis, Minnesota·Solar Installation
ResidentialCommercial

12+ yrs

Experience

150 km

Service radius

51-200

Employees

Profile information

83%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile0%

About Wolf River Electric

Midwest solar and electrical company serving Minneapolis with in-house installation teams since 2014

Minneapolis, Minnesota 55040

Minneapolis, Minnesota 55040

Services Offered

Solar InstallationBattery StorageSolar DesignEV Chargingelectrical_panel_upgradebackup_generator

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

NABCEPBBB A+ Accredited

Reported Equipment Brands

Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.

Panels

RECSilfab

Inverters

EnphaseSolarEdge

Batteries

Tesla PowerwallEnphase

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

25yr

Inverter Warranty

10yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

Minneapolis, MinnesotaSaint Paul, MinnesotaIsanti, MinnesotaAnoka, MinnesotaBlaine, MinnesotaMaple Grove, MinnesotaCottage Grove, MinnesotaWoodbury, Minnesota

Customer Reviews

No reviews yet. Be the first to review Wolf River Electric!

Write a Review

Frequently Asked Questions

How do I get a quote from Wolf River Electric?

You can request a quote through the form on this page or contact Wolf River Electric directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Wolf River Electric serve?

Wolf River Electric is based in Minneapolis and serves within a 150 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Wolf River Electric hold?

This profile lists the following reported certifications: NABCEP, BBB A+ Accredited. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does Wolf River Electric offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Wolf River Electric for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Wolf River Electric for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Wolf River Electric handle permits and paperwork?

The exact scope is not verified on this profile. Ask Wolf River Electric which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Business Details

Founded2014
Employees51-200
Profile StatusUnclaimed
Profile Complete83%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Wolf River Electric

Send your project details to request follow-up from Wolf River Electric. Response timing and consultation terms are set by the company.

For Wolf River Electric

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
W

Wolf River Electric

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.