W

Wiring Solutions Plus in Durham

Durham, North Carolina·Solar Installation
ResidentialCommercial

6+ yrs

Experience

80 km

Service radius

1-10

Employees

Profile information

83%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile0%

About Wiring Solutions Plus

Raleigh-Durham solar and electrical experts — residential and commercial solar installations with full electrical services

Durham, North Carolina 27616

Durham, North Carolina 27616

Services Offered

Solar InstallationBattery StorageEV ChargingMaintenance

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

BBB AccreditedLicensed Electrical Contractor

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

25yr

Inverter Warranty

10yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

Durham, North CarolinaRaleigh, North CarolinaWake Forest, North CarolinaCary, North CarolinaApex, North Carolina

Customer Reviews

No reviews yet. Be the first to review Wiring Solutions Plus!

Write a Review

Frequently Asked Questions

How do I get a quote from Wiring Solutions Plus?

You can request a quote through the form on this page or contact Wiring Solutions Plus directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Wiring Solutions Plus serve?

Wiring Solutions Plus is based in Durham and serves within a 80 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Wiring Solutions Plus hold?

This profile lists the following reported certifications: BBB Accredited, Licensed Electrical Contractor. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does Wiring Solutions Plus offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Wiring Solutions Plus for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Wiring Solutions Plus for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Wiring Solutions Plus handle permits and paperwork?

The exact scope is not verified on this profile. Ask Wiring Solutions Plus which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Business Details

Founded2020
Employees1-10
Profile StatusUnclaimed
Profile Complete83%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Wiring Solutions Plus

Send your project details to request follow-up from Wiring Solutions Plus. Response timing and consultation terms are set by the company.

For Wiring Solutions Plus

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
W

Wiring Solutions Plus

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.