W

West Seattle Electric and Solar in Seattle

Seattle, Washington·Solar Installation
Residential

9+ yrs

Experience

60 km

Service radius

1-10

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About West Seattle Electric and Solar

Family- and veteran-owned electrical and solar contractor serving West Seattle and beyond

Seattle, Washington 98126

Seattle, Washington 98126

Services Offered

Solar InstallationBattery Storageelectrical_services

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

BBB Accredited

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

12yr

Inverter Warranty

10yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

Seattle, WashingtonBurien, WashingtonWhite Center, WashingtonTukwila, Washington

Customer Reviews

No reviews yet. Be the first to review West Seattle Electric and Solar!

Write a Review

Frequently Asked Questions

How do I get a quote from West Seattle Electric and Solar?

You can request a quote through the form on this page or contact West Seattle Electric and Solar directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does West Seattle Electric and Solar serve?

West Seattle Electric and Solar is based in Seattle and serves within a 60 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does West Seattle Electric and Solar hold?

This profile lists the following reported certifications: BBB Accredited. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does West Seattle Electric and Solar offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask West Seattle Electric and Solar for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask West Seattle Electric and Solar for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does West Seattle Electric and Solar handle permits and paperwork?

The exact scope is not verified on this profile. Ask West Seattle Electric and Solar which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Social Media

Request a Quote

Business Details

Founded2017
Employees1-10
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from West Seattle Electric and Solar

Send your project details to request follow-up from West Seattle Electric and Solar. Response timing and consultation terms are set by the company.

For West Seattle Electric and Solar

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
W

West Seattle Electric and Solar

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.