Walter Roofing + Solar in Des Moines
100 km
Service radius
11-50
Employees
Profile information
About Walter Roofing + Solar
Award-winning roofing and solar company serving Des Moines homeowners and businesses with integrated energy solutions
Des Moines, Iowa 50325
Des Moines, Iowa 50325
Services Offered
Reported Certifications
These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.
Reported Warranty Coverage
Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.
25yr
Panel Warranty
12yr
Inverter Warranty
10yr
Installation Warranty
Questions to Ask About Installation
Initial Consultation
Ask whether a site assessment is offered, what it covers, and whether it has a fee.
System Design
Request a design showing the proposed equipment, layout, assumptions, and itemized costs.
Permitting & Approval
Confirm who handles permits, inspections, and utility interconnection, and which fees are included.
Installation
Verify the installation team’s licenses, relevant certifications, and insurance.
Commissioning & Handover
Confirm the testing records, monitoring access, warranty registration, and support included in the handover.
Service Areas
Customer Reviews
No reviews yet. Be the first to review Walter Roofing + Solar!
Frequently Asked Questions
How do I get a quote from Walter Roofing + Solar?
You can request a quote through the form on this page or contact Walter Roofing + Solar directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.
What areas does Walter Roofing + Solar serve?
Walter Roofing + Solar is based in Des Moines and serves within a 100 km radius. Check the Service Areas section above for a complete list of locations.
What certifications does Walter Roofing + Solar hold?
This profile lists the following reported certifications: Owens Corning Certified, Versico Certified. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.
What warranty does Walter Roofing + Solar offer?
This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Walter Roofing + Solar for current written terms and exclusions.
How long does installation take?
The timeline is project- and jurisdiction-specific. Ask Walter Roofing + Solar for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.
Does Walter Roofing + Solar handle permits and paperwork?
The exact scope is not verified on this profile. Ask Walter Roofing + Solar which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.
Business Details
About this profile
The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.
Request a Quote from Walter Roofing + Solar
Send your project details to request follow-up from Walter Roofing + Solar. Response timing and consultation terms are set by the company.
For Walter Roofing + Solar
Claim Your Free Profile
Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.
Walter Roofing + Solar