V

Vulcan Solar Power in Birmingham

Birmingham, Alabama·Solar Installation
ResidentialCommercialIndustrial

11+ yrs

Experience

200 km

Service radius

2-10

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About Vulcan Solar Power

NABCEP-certified Birmingham solar installer providing turnkey residential, commercial, and utility-scale solar systems since 2015

Birmingham, Alabama 35216

Birmingham, Alabama 35216

Services Offered

Solar InstallationSolar DesignMonitoring

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

NABCEPBBB A+ Rating

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

10yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

Birmingham, AlabamaHoover, AlabamaVestavia Hills, AlabamaHomewood, AlabamaMountain Brook, AlabamaTuscaloosa, AlabamaHuntsville, AlabamaMontgomery, Alabama

Customer Reviews

No reviews yet. Be the first to review Vulcan Solar Power!

Write a Review

Frequently Asked Questions

How do I get a quote from Vulcan Solar Power?

You can request a quote through the form on this page or contact Vulcan Solar Power directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Vulcan Solar Power serve?

Vulcan Solar Power is based in Birmingham and serves within a 200 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Vulcan Solar Power hold?

This profile lists the following reported certifications: NABCEP, BBB A+ Rating. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does Vulcan Solar Power offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Vulcan Solar Power for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Vulcan Solar Power for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Vulcan Solar Power handle permits and paperwork?

The exact scope is not verified on this profile. Ask Vulcan Solar Power which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Social Media

Request a Quote

Business Details

Founded2015
Employees2-10
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Vulcan Solar Power

Send your project details to request follow-up from Vulcan Solar Power. Response timing and consultation terms are set by the company.

For Vulcan Solar Power

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
V

Vulcan Solar Power

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.