V

Vespa Solar in Columbus

Columbus, Ohio·Solar Installation
Residential

5+ yrs

Experience

150 km

Service radius

2-10

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About Vespa Solar

Locally owned Columbus solar and home improvement company with 30-year panel and inverter warranties

Columbus, Ohio 43220

Columbus, Ohio 43220

Services Offered

Solar InstallationBattery StorageSolar DesignRoof AssessmentMonitoring

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

30yr

Panel Warranty

30yr

Inverter Warranty

10yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

Columbus, OhioUpper Arlington, OhioDublin, OhioWesterville, OhioHilliard, OhioGrove City, OhioTallmadge, OhioAkron, Ohio

Customer Reviews

No reviews yet. Be the first to review Vespa Solar!

Write a Review

Frequently Asked Questions

How do I get a quote from Vespa Solar?

You can request a quote through the form on this page or contact Vespa Solar directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Vespa Solar serve?

Vespa Solar is based in Columbus and serves within a 150 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Vespa Solar hold?

This profile does not list independently verified certifications. Ask Vespa Solar for current license, insurance, and credential details, then confirm them with the relevant authority.

What warranty does Vespa Solar offer?

This profile reports 30-year panel coverage and 10-year workmanship coverage. Ask Vespa Solar for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Vespa Solar for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Vespa Solar handle permits and paperwork?

The exact scope is not verified on this profile. Ask Vespa Solar which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Social Media

Request a Quote

Business Details

Founded2021
Employees2-10
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Vespa Solar

Send your project details to request follow-up from Vespa Solar. Response timing and consultation terms are set by the company.

For Vespa Solar

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
V

Vespa Solar

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.