V

Velo Solar in Atlanta

Atlanta, Georgia·Solar Installation
Commercial

18+ yrs

Experience

100+

Projects

200 km

Service radius

11-50

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About Velo Solar

Atlanta's leading commercial solar installer since 2008, with 35+ MW installed across 30 states and a licensed Professional Engineer on staff

Atlanta, Georgia 30307

Atlanta, Georgia 30307

Services Offered

Solar InstallationBattery StorageSolar DesignEnergy AuditGrid ConnectionMonitoringMaintenance

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

Licensed Professional EngineerBBB Accredited

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

12yr

Inverter Warranty

10yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

Atlanta, GeorgiaDecatur, GeorgiaSavannah, GeorgiaMacon, GeorgiaAugusta, GeorgiaAthens, Georgia

Customer Reviews

No reviews yet. Be the first to review Velo Solar!

Write a Review

Frequently Asked Questions

How do I get a quote from Velo Solar?

You can request a quote through the form on this page or contact Velo Solar directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Velo Solar serve?

Velo Solar is based in Atlanta and serves within a 200 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Velo Solar hold?

This profile lists the following reported certifications: Licensed Professional Engineer, BBB Accredited. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does Velo Solar offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Velo Solar for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Velo Solar for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Velo Solar handle permits and paperwork?

The exact scope is not verified on this profile. Ask Velo Solar which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Social Media

Request a Quote

Business Details

Founded2008
Employees11-50
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Velo Solar

Send your project details to request follow-up from Velo Solar. Response timing and consultation terms are set by the company.

For Velo Solar

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
V

Velo Solar

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.