Vanguard Solar Services in Aurora
7+ yrs
Experience
80 km
Service radius
1-10
Employees
Profile information
About Vanguard Solar Services
Denver-based solar installer providing residential installations with system decommissioning and maintenance services
Aurora, Colorado 80216
Aurora, Colorado 80216
Services Offered
Reported Warranty Coverage
Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.
25yr
Panel Warranty
12yr
Inverter Warranty
10yr
Installation Warranty
Questions to Ask About Installation
Initial Consultation
Ask whether a site assessment is offered, what it covers, and whether it has a fee.
System Design
Request a design showing the proposed equipment, layout, assumptions, and itemized costs.
Permitting & Approval
Confirm who handles permits, inspections, and utility interconnection, and which fees are included.
Installation
Verify the installation team’s licenses, relevant certifications, and insurance.
Commissioning & Handover
Confirm the testing records, monitoring access, warranty registration, and support included in the handover.
Service Areas
Customer Reviews
No reviews yet. Be the first to review Vanguard Solar Services!
Frequently Asked Questions
How do I get a quote from Vanguard Solar Services?
You can request a quote through the form on this page or contact Vanguard Solar Services directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.
What areas does Vanguard Solar Services serve?
Vanguard Solar Services is based in Aurora and serves within a 80 km radius. Check the Service Areas section above for a complete list of locations.
What certifications does Vanguard Solar Services hold?
This profile does not list independently verified certifications. Ask Vanguard Solar Services for current license, insurance, and credential details, then confirm them with the relevant authority.
What warranty does Vanguard Solar Services offer?
This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Vanguard Solar Services for current written terms and exclusions.
How long does installation take?
The timeline is project- and jurisdiction-specific. Ask Vanguard Solar Services for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.
Does Vanguard Solar Services handle permits and paperwork?
The exact scope is not verified on this profile. Ask Vanguard Solar Services which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.
Contact Information
Request a QuoteBusiness Details
About this profile
The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.
Request a Quote from Vanguard Solar Services
Send your project details to request follow-up from Vanguard Solar Services. Response timing and consultation terms are set by the company.
For Vanguard Solar Services
Claim Your Free Profile
Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.
Vanguard Solar Services