T

Trivium Solar in Memphis

Memphis, Tennessee·Solar Installation
ResidentialCommercial
0

80 km

Service radius

1-10

Employees

Profile information

83%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile0%

About Trivium Solar

Memphis solar installer with 16 years of direct-to-consumer experience and partnerships with Solar Insure for comprehensive monitoring

Memphis, Tennessee 38119

Memphis, Tennessee 38119

Services Offered

Solar InstallationBattery StorageMonitoring

Reported Equipment Brands

Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.

Batteries

SPAN Smart Panel

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

25yr

Inverter Warranty

10yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

Memphis, TennesseeGermantown, TennesseeBartlett, TennesseeCollierville, TennesseeCordova, Tennessee

Customer Reviews

No reviews yet. Be the first to review Trivium Solar!

Write a Review

Frequently Asked Questions

How do I get a quote from Trivium Solar?

You can request a quote through the form on this page or contact Trivium Solar directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Trivium Solar serve?

Trivium Solar is based in Memphis and serves within a 80 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Trivium Solar hold?

This profile does not list independently verified certifications. Ask Trivium Solar for current license, insurance, and credential details, then confirm them with the relevant authority.

What warranty does Trivium Solar offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Trivium Solar for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Trivium Solar for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Trivium Solar handle permits and paperwork?

The exact scope is not verified on this profile. Ask Trivium Solar which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Business Details

0
Employees1-10
Profile StatusUnclaimed
Profile Complete83%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Trivium Solar

Send your project details to request follow-up from Trivium Solar. Response timing and consultation terms are set by the company.

For Trivium Solar

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
T

Trivium Solar

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.