T

Tri-State Electrical Contractors in Huntsville

Huntsville, Alabama·Solar Installation
CommercialIndustrial
0

250 km

Service radius

51-200

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About Tri-State Electrical Contractors

Premier commercial and industrial solar and electrical contractor licensed in Alabama, Tennessee, Georgia, and North Carolina

Huntsville, Alabama 37408

Huntsville, Alabama 37408

Services Offered

Solar InstallationBattery StorageSolar DesignMaintenanceGrid Connection

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

Licensed in AlabamaLicensed in TennesseeLicensed in GeorgiaLicensed in North Carolina

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

25yr

Inverter Warranty

10yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

Huntsville, AlabamaChattanooga, AlabamaNashville, AlabamaAtlanta, AlabamaDecatur, AlabamaBirmingham, Alabama

Customer Reviews

No reviews yet. Be the first to review Tri-State Electrical Contractors!

Write a Review

Frequently Asked Questions

How do I get a quote from Tri-State Electrical Contractors?

You can request a quote through the form on this page or contact Tri-State Electrical Contractors directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Tri-State Electrical Contractors serve?

Tri-State Electrical Contractors is based in Huntsville and serves within a 250 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Tri-State Electrical Contractors hold?

This profile lists the following reported certifications: Licensed in Alabama, Licensed in Tennessee, Licensed in Georgia, Licensed in North Carolina. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does Tri-State Electrical Contractors offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Tri-State Electrical Contractors for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Tri-State Electrical Contractors for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Tri-State Electrical Contractors handle permits and paperwork?

The exact scope is not verified on this profile. Ask Tri-State Electrical Contractors which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Social Media

Request a Quote

Business Details

0
Employees51-200
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Tri-State Electrical Contractors

Send your project details to request follow-up from Tri-State Electrical Contractors. Response timing and consultation terms are set by the company.

For Tri-State Electrical Contractors

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
T

Tri-State Electrical Contractors

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.