T

Touch Of Power Solutions in Charlotte

Charlotte, North Carolina·Solar Installation
ResidentialCommercial

11+ yrs

Experience

80 km

Service radius

2-10

Employees

Profile information

83%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile0%

About Touch Of Power Solutions

Charlotte-based electrical and solar contractor providing 24/7 service for residential and commercial solar installations

Charlotte, North Carolina 28216

Charlotte, North Carolina 28216

Services Offered

Solar Installationelectrical_servicesSolar Design

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

NC Licensed Electrical ContractorBBB Accredited

Reported Equipment Brands

Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.

Panels

Q Cells

Inverters

Enphase

Batteries

Enphase

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

25yr

Inverter Warranty

5yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

Charlotte, North CarolinaConcord, North CarolinaHuntersville, North CarolinaMatthews, North CarolinaGastonia, North CarolinaMint Hill, North Carolina

Customer Reviews

No reviews yet. Be the first to review Touch Of Power Solutions!

Write a Review

Frequently Asked Questions

How do I get a quote from Touch Of Power Solutions?

You can request a quote through the form on this page or contact Touch Of Power Solutions directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Touch Of Power Solutions serve?

Touch Of Power Solutions is based in Charlotte and serves within a 80 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Touch Of Power Solutions hold?

This profile lists the following reported certifications: NC Licensed Electrical Contractor, BBB Accredited. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does Touch Of Power Solutions offer?

This profile reports 25-year panel coverage and 5-year workmanship coverage. Ask Touch Of Power Solutions for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Touch Of Power Solutions for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Touch Of Power Solutions handle permits and paperwork?

The exact scope is not verified on this profile. Ask Touch Of Power Solutions which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Business Details

Founded2015
Employees2-10
Profile StatusUnclaimed
Profile Complete83%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Touch Of Power Solutions

Send your project details to request follow-up from Touch Of Power Solutions. Response timing and consultation terms are set by the company.

For Touch Of Power Solutions

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
T

Touch Of Power Solutions

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.