T

Top Tier Solar Solutions in Charlotte

Charlotte, North Carolina·Solar Installation
Residential

7+ yrs

Experience

200 km

Service radius

51-200

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About Top Tier Solar Solutions

Full-service residential solar company ranked No. 4 on the 2024 Inc. 5000 list

Charlotte, North Carolina 28217

Charlotte, North Carolina 28217

Services Offered

Solar InstallationBattery StorageroofingSolar Design

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

BBB A+ RatingLicensed Electrical Contractor (NC, SC, VA, OH, KY, TX)

Reported Equipment Brands

Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.

Panels

SilfabQ Cells

Inverters

EnphaseSolarEdge

Batteries

Enphase

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

25yr

Inverter Warranty

25yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

Charlotte, North CarolinaRaleigh, North CarolinaGreensboro, North CarolinaWinston-Salem, North CarolinaDurham, North CarolinaFayetteville, North CarolinaConcord, North CarolinaGastonia, North Carolina

Customer Reviews

No reviews yet. Be the first to review Top Tier Solar Solutions!

Write a Review

Frequently Asked Questions

How do I get a quote from Top Tier Solar Solutions?

You can request a quote through the form on this page or contact Top Tier Solar Solutions directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Top Tier Solar Solutions serve?

Top Tier Solar Solutions is based in Charlotte and serves within a 200 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Top Tier Solar Solutions hold?

This profile lists the following reported certifications: BBB A+ Rating, Licensed Electrical Contractor (NC, SC, VA, OH, KY, TX). SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does Top Tier Solar Solutions offer?

This profile reports 25-year panel coverage and 25-year workmanship coverage. Ask Top Tier Solar Solutions for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Top Tier Solar Solutions for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Top Tier Solar Solutions handle permits and paperwork?

The exact scope is not verified on this profile. Ask Top Tier Solar Solutions which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Social Media

Request a Quote

Business Details

Founded2019
Employees51-200
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Top Tier Solar Solutions

Send your project details to request follow-up from Top Tier Solar Solutions. Response timing and consultation terms are set by the company.

For Top Tier Solar Solutions

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
T

Top Tier Solar Solutions

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.