T

T&K Electric Company in Mesa

Mesa, Arizona·Solar Installation
ResidentialCommercial

8+ yrs

Experience

80 km

Service radius

11-50

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About T&K Electric Company

Licensed Mesa electrical contractor and solar installer with 25-year warranty serving nine Arizona locations

Mesa, Arizona 85206

Mesa, Arizona 85206

Services Offered

Solar Installationelectricalev_charger

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

Licensed Electrical ContractorBBB Accredited

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

25yr

Inverter Warranty

25yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

Mesa, ArizonaPhoenix, ArizonaScottsdale, ArizonaTempe, ArizonaChandler, ArizonaGlendale, ArizonaParadise Valley, ArizonaFountain Hills, ArizonaAhwatukee, Arizona

Customer Reviews

No reviews yet. Be the first to review T&K Electric Company!

Write a Review

Frequently Asked Questions

How do I get a quote from T&K Electric Company?

You can request a quote through the form on this page or contact T&K Electric Company directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does T&K Electric Company serve?

T&K Electric Company is based in Mesa and serves within a 80 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does T&K Electric Company hold?

This profile lists the following reported certifications: Licensed Electrical Contractor, BBB Accredited. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does T&K Electric Company offer?

This profile reports 25-year panel coverage and 25-year workmanship coverage. Ask T&K Electric Company for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask T&K Electric Company for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does T&K Electric Company handle permits and paperwork?

The exact scope is not verified on this profile. Ask T&K Electric Company which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Social Media

Request a Quote

Business Details

Founded2018
Employees11-50
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from T&K Electric Company

Send your project details to request follow-up from T&K Electric Company. Response timing and consultation terms are set by the company.

For T&K Electric Company

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
T

T&K Electric Company

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.