T

Tiger Solar in Richmond

Richmond, Virginia·Solar Installation
ResidentialCommercial

22+ yrs

Experience

160 km

Service radius

11-50

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About Tiger Solar

Virginia solar installer with 20+ years of experience, four branch locations, and NABCEP-certified technicians

Richmond, Virginia 23230

Richmond, Virginia 23230

Services Offered

Solar InstallationSolar DesignBattery StorageMaintenanceMonitoringGrid Connection

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

NABCEPBBB Accredited

Reported Equipment Brands

Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.

Panels

RECQcells

Inverters

EnphaseSolarEdge

Batteries

Tesla PowerwallEnphase IQ Battery

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

25yr

Inverter Warranty

10yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

Richmond, VirginiaCharlottesville, VirginiaVirginia Beach, VirginiaNorfolk, VirginiaHenrico, VirginiaGlen Allen, VirginiaMidlothian, Virginia

Customer Reviews

No reviews yet. Be the first to review Tiger Solar!

Write a Review

Frequently Asked Questions

How do I get a quote from Tiger Solar?

You can request a quote through the form on this page or contact Tiger Solar directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Tiger Solar serve?

Tiger Solar is based in Richmond and serves within a 160 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Tiger Solar hold?

This profile lists the following reported certifications: NABCEP, BBB Accredited. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does Tiger Solar offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Tiger Solar for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Tiger Solar for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Tiger Solar handle permits and paperwork?

The exact scope is not verified on this profile. Ask Tiger Solar which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Social Media

Request a Quote

Business Details

Founded2004
Employees11-50
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Tiger Solar

Send your project details to request follow-up from Tiger Solar. Response timing and consultation terms are set by the company.

For Tiger Solar

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
T

Tiger Solar

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.