T

Think Solar OKC in Oklahoma City

Oklahoma City, Oklahoma·Solar Installation
Residential

16+ yrs

Experience

80 km

Service radius

2-10

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About Think Solar OKC

Oklahoma City solar installer with 12+ years of service helping families save on energy bills

Oklahoma City, Oklahoma 73112

Oklahoma City, Oklahoma 73112

Services Offered

Solar Installation

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

10yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

Oklahoma City, OklahomaEdmond, OklahomaBethany, OklahomaWarr Acres, OklahomaThe Village, OklahomaNichols Hills, Oklahoma

Customer Reviews

No reviews yet. Be the first to review Think Solar OKC!

Write a Review

Frequently Asked Questions

How do I get a quote from Think Solar OKC?

You can request a quote through the form on this page or contact Think Solar OKC directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Think Solar OKC serve?

Think Solar OKC is based in Oklahoma City and serves within a 80 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Think Solar OKC hold?

This profile does not list independently verified certifications. Ask Think Solar OKC for current license, insurance, and credential details, then confirm them with the relevant authority.

What warranty does Think Solar OKC offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Think Solar OKC for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Think Solar OKC for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Think Solar OKC handle permits and paperwork?

The exact scope is not verified on this profile. Ask Think Solar OKC which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Social Media

Request a Quote

Business Details

Founded2010
Employees2-10
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Think Solar OKC

Send your project details to request follow-up from Think Solar OKC. Response timing and consultation terms are set by the company.

For Think Solar OKC

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
T

Think Solar OKC

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.