T

The Solar Guys in Kansas City

Kansas City, Missouri·Solar Installation
Residential

14+ yrs

Experience

200 km

Service radius

11-50

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About The Solar Guys

Family-owned Kansas City solar installer since 2012 with Enphase Platinum Certified status and 25-year comprehensive warranty

Kansas City, Missouri 64152

Kansas City, Missouri 64152

Services Offered

Solar InstallationBattery StorageSolar DesignEnergy AuditGrid ConnectionMonitoring

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

NABCEPSEIA MemberEnphase Platinum Certified

Reported Equipment Brands

Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.

Panels

REC

Inverters

Enphase

Batteries

Enphase IQ Battery

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

25yr

Inverter Warranty

25yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

Kansas City, MissouriParkville, MissouriLiberty, MissouriGladstone, MissouriIndependence, MissouriLee's Summit, MissouriBlue Springs, MissouriDes Moines, Missouri

Customer Reviews

No reviews yet. Be the first to review The Solar Guys!

Write a Review

Frequently Asked Questions

How do I get a quote from The Solar Guys?

You can request a quote through the form on this page or contact The Solar Guys directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does The Solar Guys serve?

The Solar Guys is based in Kansas City and serves within a 200 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does The Solar Guys hold?

This profile lists the following reported certifications: NABCEP, SEIA Member, Enphase Platinum Certified. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does The Solar Guys offer?

This profile reports 25-year panel coverage and 25-year workmanship coverage. Ask The Solar Guys for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask The Solar Guys for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does The Solar Guys handle permits and paperwork?

The exact scope is not verified on this profile. Ask The Solar Guys which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Social Media

Request a Quote

Business Details

Founded2012
Employees11-50
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from The Solar Guys

Send your project details to request follow-up from The Solar Guys. Response timing and consultation terms are set by the company.

For The Solar Guys

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
T

The Solar Guys

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.