T

The Big Deal Solar in Riverside

Riverside, California·Solar Installation
ResidentialCommercial
0

100 km

Service radius

11-50

Employees

Profile information

83%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile0%

About The Big Deal Solar

Woman-owned, veteran-operated renewable energy contractor serving Southern California

Riverside, California 92570

Riverside, California 92570

Services Offered

Solar InstallationBattery Storage

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

12yr

Inverter Warranty

10yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

Riverside, CaliforniaPerris, CaliforniaCathedral City, CaliforniaPalm Springs, CaliforniaPalm Desert, CaliforniaCorona, California

Customer Reviews

No reviews yet. Be the first to review The Big Deal Solar!

Write a Review

Frequently Asked Questions

How do I get a quote from The Big Deal Solar?

You can request a quote through the form on this page or contact The Big Deal Solar directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does The Big Deal Solar serve?

The Big Deal Solar is based in Riverside and serves within a 100 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does The Big Deal Solar hold?

This profile does not list independently verified certifications. Ask The Big Deal Solar for current license, insurance, and credential details, then confirm them with the relevant authority.

What warranty does The Big Deal Solar offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask The Big Deal Solar for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask The Big Deal Solar for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does The Big Deal Solar handle permits and paperwork?

The exact scope is not verified on this profile. Ask The Big Deal Solar which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Business Details

0
Employees11-50
Profile StatusUnclaimed
Profile Complete83%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from The Big Deal Solar

Send your project details to request follow-up from The Big Deal Solar. Response timing and consultation terms are set by the company.

For The Big Deal Solar

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
T

The Big Deal Solar

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.