T

Texas Solar Professional in Arlington

Arlington, Texas·Solar Installation
ResidentialCommercial

6+ yrs

Experience

100 km

Service radius

11-50

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About Texas Solar Professional

EnergySage Installer of the Year providing solar, battery, HVAC, and permit assistance across DFW

Arlington, Texas 75104

Arlington, Texas 75104

Services Offered

Solar InstallationBattery StorageSolar DesignGrid Connection

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

EnergySage Installer of the YearGAF Certified

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

12yr

Inverter Warranty

10yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

Arlington, TexasCedar Hill, TexasDallas, TexasFort Worth, TexasGrand Prairie, TexasMansfield, TexasMidlothian, Texas

Customer Reviews

No reviews yet. Be the first to review Texas Solar Professional!

Write a Review

Frequently Asked Questions

How do I get a quote from Texas Solar Professional?

You can request a quote through the form on this page or contact Texas Solar Professional directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Texas Solar Professional serve?

Texas Solar Professional is based in Arlington and serves within a 100 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Texas Solar Professional hold?

This profile lists the following reported certifications: EnergySage Installer of the Year, GAF Certified. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does Texas Solar Professional offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Texas Solar Professional for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Texas Solar Professional for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Texas Solar Professional handle permits and paperwork?

The exact scope is not verified on this profile. Ask Texas Solar Professional which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Social Media

Request a Quote

Business Details

Founded2020
Employees11-50
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Texas Solar Professional

Send your project details to request follow-up from Texas Solar Professional. Response timing and consultation terms are set by the company.

For Texas Solar Professional

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
T

Texas Solar Professional

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.