Texas Direct Solar in Houston
9+ yrs
Experience
80 km
Service radius
11-50
Employees
Profile information
About Texas Direct Solar
Family-owned Houston solar installer since 2017 providing honest and affordable residential and commercial installations
Houston, Texas 77023
Houston, Texas 77023
Services Offered
Reported Warranty Coverage
Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.
25yr
Panel Warranty
25yr
Inverter Warranty
10yr
Installation Warranty
Questions to Ask About Installation
Initial Consultation
Ask whether a site assessment is offered, what it covers, and whether it has a fee.
System Design
Request a design showing the proposed equipment, layout, assumptions, and itemized costs.
Permitting & Approval
Confirm who handles permits, inspections, and utility interconnection, and which fees are included.
Installation
Verify the installation team’s licenses, relevant certifications, and insurance.
Commissioning & Handover
Confirm the testing records, monitoring access, warranty registration, and support included in the handover.
Service Areas
Customer Reviews
No reviews yet. Be the first to review Texas Direct Solar!
Frequently Asked Questions
How do I get a quote from Texas Direct Solar?
You can request a quote through the form on this page or contact Texas Direct Solar directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.
What areas does Texas Direct Solar serve?
Texas Direct Solar is based in Houston and serves within a 80 km radius. Check the Service Areas section above for a complete list of locations.
What certifications does Texas Direct Solar hold?
This profile does not list independently verified certifications. Ask Texas Direct Solar for current license, insurance, and credential details, then confirm them with the relevant authority.
What warranty does Texas Direct Solar offer?
This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Texas Direct Solar for current written terms and exclusions.
How long does installation take?
The timeline is project- and jurisdiction-specific. Ask Texas Direct Solar for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.
Does Texas Direct Solar handle permits and paperwork?
The exact scope is not verified on this profile. Ask Texas Direct Solar which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.
Contact Information
Request a QuoteBusiness Details
About this profile
The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.
Request a Quote from Texas Direct Solar
Send your project details to request follow-up from Texas Direct Solar. Response timing and consultation terms are set by the company.
For Texas Direct Solar
Claim Your Free Profile
Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.
Texas Direct Solar