T

TayCo Electric & Solar in Charlotte

Charlotte, North Carolina·Solar Installation
ResidentialCommercial

20+ yrs

Experience

80 km

Service radius

11-50

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About TayCo Electric & Solar

NABCEP-certified and SunPower award-winning electrical and solar contractor serving the greater Charlotte area since 2006

Charlotte, North Carolina 28079

Charlotte, North Carolina 28079

Services Offered

Solar InstallationBattery StorageEV ChargingSolar Designelectrical_services

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

NABCEPTesla Powerwall CertifiedSunPower Excellence Award

Reported Equipment Brands

Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.

Panels

SunPower

Inverters

EnphaseSolarEdge

Batteries

Tesla Powerwall

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

25yr

Inverter Warranty

10yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

Charlotte, North CarolinaIndian Trail, North CarolinaMatthews, North CarolinaMonroe, North CarolinaMint Hill, North CarolinaWaxhaw, North CarolinaWeddington, North CarolinaStallings, North Carolina

Customer Reviews

No reviews yet. Be the first to review TayCo Electric & Solar!

Write a Review

Frequently Asked Questions

How do I get a quote from TayCo Electric & Solar?

You can request a quote through the form on this page or contact TayCo Electric & Solar directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does TayCo Electric & Solar serve?

TayCo Electric & Solar is based in Charlotte and serves within a 80 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does TayCo Electric & Solar hold?

This profile lists the following reported certifications: NABCEP, Tesla Powerwall Certified, SunPower Excellence Award. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does TayCo Electric & Solar offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask TayCo Electric & Solar for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask TayCo Electric & Solar for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does TayCo Electric & Solar handle permits and paperwork?

The exact scope is not verified on this profile. Ask TayCo Electric & Solar which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Social Media

Request a Quote

Business Details

Founded2006
Employees11-50
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from TayCo Electric & Solar

Send your project details to request follow-up from TayCo Electric & Solar. Response timing and consultation terms are set by the company.

For TayCo Electric & Solar

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
T

TayCo Electric & Solar

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.