S

Supreme Power in New Orleans

New Orleans, Louisiana·Solar Installation
ResidentialCommercial

14+ yrs

Experience

100 km

Service radius

2-10

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About Supreme Power

Published directory profile for Supreme Power in New Orleans. Verify services, credentials, ratings, and references directly with their original sources.

New Orleans, Louisiana 70001

New Orleans, Louisiana 70001

Services Offered

Solar InstallationMaintenanceMonitoringEnergy Audit

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

BBB A+ Rating

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

5yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

New Orleans, LouisianaMetairie, LouisianaKenner, LouisianaGretna, LouisianaHarvey, LouisianaSlidell, LouisianaCovington, Louisiana

Customer Reviews

No reviews yet. Be the first to review Supreme Power!

Write a Review

Frequently Asked Questions

How do I get a quote from Supreme Power?

You can request a quote through the form on this page or contact Supreme Power directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Supreme Power serve?

Supreme Power is based in New Orleans and serves within a 100 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Supreme Power hold?

This profile lists the following reported certifications: BBB A+ Rating. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does Supreme Power offer?

This profile reports 5-year workmanship coverage. Ask Supreme Power for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Supreme Power for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Supreme Power handle permits and paperwork?

The exact scope is not verified on this profile. Ask Supreme Power which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Social Media

Request a Quote

Business Details

Founded2012
Employees2-10
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Supreme Power

Send your project details to request follow-up from Supreme Power. Response timing and consultation terms are set by the company.

For Supreme Power

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
S

Supreme Power

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.