Superior Solar Inc in Stockton
16+ yrs
Experience
100 km
Service radius
11-50
Employees
Profile information
About Superior Solar Inc
SunPower certified dealer in Roseville specializing in residential, commercial, and agricultural solar across the Central Valley
Stockton, California 95678
Stockton, California 95678
Services Offered
Reported Certifications
These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.
Reported Equipment Brands
Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.
Panels
Reported Warranty Coverage
Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.
25yr
Panel Warranty
25yr
Inverter Warranty
10yr
Installation Warranty
Questions to Ask About Installation
Initial Consultation
Ask whether a site assessment is offered, what it covers, and whether it has a fee.
System Design
Request a design showing the proposed equipment, layout, assumptions, and itemized costs.
Permitting & Approval
Confirm who handles permits, inspections, and utility interconnection, and which fees are included.
Installation
Verify the installation team’s licenses, relevant certifications, and insurance.
Commissioning & Handover
Confirm the testing records, monitoring access, warranty registration, and support included in the handover.
Service Areas
Customer Reviews
No reviews yet. Be the first to review Superior Solar Inc!
Frequently Asked Questions
How do I get a quote from Superior Solar Inc?
You can request a quote through the form on this page or contact Superior Solar Inc directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.
What areas does Superior Solar Inc serve?
Superior Solar Inc is based in Stockton and serves within a 100 km radius. Check the Service Areas section above for a complete list of locations.
What certifications does Superior Solar Inc hold?
This profile lists the following reported certifications: SunPower Certified Dealer, BBB Accredited. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.
What warranty does Superior Solar Inc offer?
This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Superior Solar Inc for current written terms and exclusions.
How long does installation take?
The timeline is project- and jurisdiction-specific. Ask Superior Solar Inc for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.
Does Superior Solar Inc handle permits and paperwork?
The exact scope is not verified on this profile. Ask Superior Solar Inc which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.
Contact Information
Request a QuoteBusiness Details
About this profile
The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.
Request a Quote from Superior Solar Inc
Send your project details to request follow-up from Superior Solar Inc. Response timing and consultation terms are set by the company.
For Superior Solar Inc
Claim Your Free Profile
Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.
Superior Solar Inc