S

SunVest Solar in Milwaukee

Milwaukee, Wisconsin·Solar Installation
ResidentialCommercial

17+ yrs

Experience

1000+

Projects

150 km

Service radius

11-50

Employees

Profile information

83%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile0%

About SunVest Solar

Wisconsin-based solar developer ranked among the nation's top 50 solar contractors since 2009

Milwaukee, Wisconsin 53072

Milwaukee, Wisconsin 53072

Services Offered

Solar InstallationSolar DesignCommercial SolarMonitoringfinancing

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

BBB AccreditedSolar Power World Top 50Focus on Energy Trade Ally

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

25yr

Inverter Warranty

10yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

Milwaukee, WisconsinPewaukee, WisconsinWaukesha, WisconsinWest Allis, WisconsinWauwatosa, WisconsinMadison, WisconsinBrookfield, WisconsinNew Berlin, WisconsinRacine, WisconsinKenosha, Wisconsin

Customer Reviews

No reviews yet. Be the first to review SunVest Solar!

Write a Review

Frequently Asked Questions

How do I get a quote from SunVest Solar?

You can request a quote through the form on this page or contact SunVest Solar directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does SunVest Solar serve?

SunVest Solar is based in Milwaukee and serves within a 150 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does SunVest Solar hold?

This profile lists the following reported certifications: BBB Accredited, Solar Power World Top 50, Focus on Energy Trade Ally. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does SunVest Solar offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask SunVest Solar for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask SunVest Solar for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does SunVest Solar handle permits and paperwork?

The exact scope is not verified on this profile. Ask SunVest Solar which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Business Details

Founded2009
Employees11-50
Profile StatusUnclaimed
Profile Complete83%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from SunVest Solar

Send your project details to request follow-up from SunVest Solar. Response timing and consultation terms are set by the company.

For SunVest Solar

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
S

SunVest Solar

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.