S

SunSent Solar in St. Louis

St. Louis, Missouri·Solar Installation
Residential

10+ yrs

Experience

120 km

Service radius

11-50

Employees

Profile information

83%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile0%

About SunSent Solar

Family-owned St. Louis solar and roofing company with over 20 years of local experience and 100% labor warranty

St. Louis, Missouri 63301

St. Louis, Missouri 63301

Services Offered

Solar InstallationBattery StorageMaintenanceRoof AssessmentSolar DesignEnergy Audit

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

BBB Accredited

Reported Equipment Brands

Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.

Panels

Silfab

Inverters

Enphase

Batteries

Enphase IQ Battery

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

25yr

Inverter Warranty

25yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

St. Louis, MissouriSt. Charles, MissouriO'Fallon, MissouriChesterfield, MissouriBallwin, MissouriEdwardsville, MissouriBelleville, Missouri

Customer Reviews

No reviews yet. Be the first to review SunSent Solar!

Write a Review

Frequently Asked Questions

How do I get a quote from SunSent Solar?

You can request a quote through the form on this page or contact SunSent Solar directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does SunSent Solar serve?

SunSent Solar is based in St. Louis and serves within a 120 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does SunSent Solar hold?

This profile lists the following reported certifications: BBB Accredited. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does SunSent Solar offer?

This profile reports 25-year panel coverage and 25-year workmanship coverage. Ask SunSent Solar for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask SunSent Solar for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does SunSent Solar handle permits and paperwork?

The exact scope is not verified on this profile. Ask SunSent Solar which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Request a Quote

Business Details

Founded2016
Employees11-50
Profile StatusUnclaimed
Profile Complete83%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from SunSent Solar

Send your project details to request follow-up from SunSent Solar. Response timing and consultation terms are set by the company.

For SunSent Solar

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
S

SunSent Solar

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.