S

Sun's Eye Solar in Tacoma

Tacoma, Washington·Solar Installation
ResidentialCommercial

34+ yrs

Experience

80 km

Service radius

11-50

Employees

Profile information

83%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile0%

About Sun's Eye Solar

Tacoma's longest-running solar installer, designing and installing residential and commercial systems since 1992

Tacoma, Washington 98409

Tacoma, Washington 98409

Services Offered

Solar InstallationBattery StorageEV ChargingMaintenance

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

Tesla Certified InstallerEnphase Certified

Reported Equipment Brands

Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.

Inverters

Enphase

Batteries

Tesla PowerwallFranklin

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

25yr

Inverter Warranty

10yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

Tacoma, WashingtonLakewood, WashingtonPuyallup, WashingtonUniversity Place, WashingtonGig Harbor, WashingtonOlympia, Washington

Customer Reviews

No reviews yet. Be the first to review Sun's Eye Solar!

Write a Review

Frequently Asked Questions

How do I get a quote from Sun's Eye Solar?

You can request a quote through the form on this page or contact Sun's Eye Solar directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Sun's Eye Solar serve?

Sun's Eye Solar is based in Tacoma and serves within a 80 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Sun's Eye Solar hold?

This profile lists the following reported certifications: Tesla Certified Installer, Enphase Certified. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does Sun's Eye Solar offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Sun's Eye Solar for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Sun's Eye Solar for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Sun's Eye Solar handle permits and paperwork?

The exact scope is not verified on this profile. Ask Sun's Eye Solar which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Business Details

Founded1992
Employees11-50
Profile StatusUnclaimed
Profile Complete83%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Sun's Eye Solar

Send your project details to request follow-up from Sun's Eye Solar. Response timing and consultation terms are set by the company.

For Sun's Eye Solar

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
S

Sun's Eye Solar

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.