S

SunRock Solar in Cincinnati

Cincinnati, Ohio·Solar Installation
ResidentialCommercial

20+ yrs

Experience

100 km

Service radius

1-10

Employees

Profile information

83%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile0%

About SunRock Solar

Cincinnati-based solar installer specializing in residential and commercial systems since 2006

Cincinnati, Ohio 45241

Cincinnati, Ohio 45241

Services Offered

Solar Installationsystem_designMaintenance

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

25yr

Inverter Warranty

10yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

Cincinnati, OhioDayton, OhioBlue Ash, OhioMason, OhioWest Chester, Ohio

Customer Reviews

No reviews yet. Be the first to review SunRock Solar!

Write a Review

Frequently Asked Questions

How do I get a quote from SunRock Solar?

You can request a quote through the form on this page or contact SunRock Solar directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does SunRock Solar serve?

SunRock Solar is based in Cincinnati and serves within a 100 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does SunRock Solar hold?

This profile does not list independently verified certifications. Ask SunRock Solar for current license, insurance, and credential details, then confirm them with the relevant authority.

What warranty does SunRock Solar offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask SunRock Solar for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask SunRock Solar for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does SunRock Solar handle permits and paperwork?

The exact scope is not verified on this profile. Ask SunRock Solar which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Business Details

Founded2006
Employees1-10
Profile StatusUnclaimed
Profile Complete83%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from SunRock Solar

Send your project details to request follow-up from SunRock Solar. Response timing and consultation terms are set by the company.

For SunRock Solar

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
S

SunRock Solar

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.