Sunrise Energy Solutions in Stockton
18+ yrs
Experience
100 km
Service radius
11-50
Employees
Profile information
About Sunrise Energy Solutions
Roseville-based solar and HVAC company serving Stockton and Northern California since 2008
Stockton, California 95678
Stockton, California 95678
Services Offered
Reported Certifications
These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.
Reported Warranty Coverage
Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.
25yr
Panel Warranty
12yr
Inverter Warranty
10yr
Installation Warranty
Questions to Ask About Installation
Initial Consultation
Ask whether a site assessment is offered, what it covers, and whether it has a fee.
System Design
Request a design showing the proposed equipment, layout, assumptions, and itemized costs.
Permitting & Approval
Confirm who handles permits, inspections, and utility interconnection, and which fees are included.
Installation
Verify the installation team’s licenses, relevant certifications, and insurance.
Commissioning & Handover
Confirm the testing records, monitoring access, warranty registration, and support included in the handover.
Service Areas
Customer Reviews
No reviews yet. Be the first to review Sunrise Energy Solutions!
Frequently Asked Questions
How do I get a quote from Sunrise Energy Solutions?
You can request a quote through the form on this page or contact Sunrise Energy Solutions directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.
What areas does Sunrise Energy Solutions serve?
Sunrise Energy Solutions is based in Stockton and serves within a 100 km radius. Check the Service Areas section above for a complete list of locations.
What certifications does Sunrise Energy Solutions hold?
This profile lists the following reported certifications: BBB Accredited. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.
What warranty does Sunrise Energy Solutions offer?
This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Sunrise Energy Solutions for current written terms and exclusions.
How long does installation take?
The timeline is project- and jurisdiction-specific. Ask Sunrise Energy Solutions for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.
Does Sunrise Energy Solutions handle permits and paperwork?
The exact scope is not verified on this profile. Ask Sunrise Energy Solutions which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.
Business Details
About this profile
The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.
Request a Quote from Sunrise Energy Solutions
Send your project details to request follow-up from Sunrise Energy Solutions. Response timing and consultation terms are set by the company.
For Sunrise Energy Solutions
Claim Your Free Profile
Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.
Sunrise Energy Solutions