S

Sunny Side Solutions in Minneapolis

Minneapolis, Minnesota·Solar Installation
ResidentialCommercial

2+ yrs

Experience

100 km

Service radius

1-10

Employees

Profile information

83%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile0%

About Sunny Side Solutions

Published directory profile for Sunny Side Solutions in Minneapolis. Verify services, credentials, ratings, and references directly with their original sources.

Minneapolis, Minnesota 55306

Minneapolis, Minnesota 55306

Services Offered

Solar InstallationBattery StorageSolar DesignEV Chargingelectrical_panel_upgrade

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

NABCEPBBB A Accredited

Reported Equipment Brands

Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.

Panels

SilfabREC

Inverters

EnphaseSolarEdgeSMA

Batteries

Enphase

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

25yr

Inverter Warranty

10yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

Minneapolis, MinnesotaSaint Paul, MinnesotaBurnsville, MinnesotaEagan, MinnesotaLakeville, MinnesotaApple Valley, MinnesotaBloomington, MinnesotaRichfield, Minnesota

Customer Reviews

No reviews yet. Be the first to review Sunny Side Solutions!

Write a Review

Frequently Asked Questions

How do I get a quote from Sunny Side Solutions?

You can request a quote through the form on this page or contact Sunny Side Solutions directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Sunny Side Solutions serve?

Sunny Side Solutions is based in Minneapolis and serves within a 100 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Sunny Side Solutions hold?

This profile lists the following reported certifications: NABCEP, BBB A Accredited. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does Sunny Side Solutions offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Sunny Side Solutions for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Sunny Side Solutions for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Sunny Side Solutions handle permits and paperwork?

The exact scope is not verified on this profile. Ask Sunny Side Solutions which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Business Details

Founded2024
Employees1-10
Profile StatusUnclaimed
Profile Complete83%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Sunny Side Solutions

Send your project details to request follow-up from Sunny Side Solutions. Response timing and consultation terms are set by the company.

For Sunny Side Solutions

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
S

Sunny Side Solutions

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.