Sundance Power Systems in Greenville
31+ yrs
Experience
120 km
Service radius
11-50
Employees
Profile information
About Sundance Power Systems
Southeast solar pioneer since 1995 with over 25 years of residential and commercial installation experience
Greenville, South Carolina 28787
Greenville, South Carolina 28787
Services Offered
Reported Warranty Coverage
Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.
25yr
Panel Warranty
25yr
Inverter Warranty
10yr
Installation Warranty
Questions to Ask About Installation
Initial Consultation
Ask whether a site assessment is offered, what it covers, and whether it has a fee.
System Design
Request a design showing the proposed equipment, layout, assumptions, and itemized costs.
Permitting & Approval
Confirm who handles permits, inspections, and utility interconnection, and which fees are included.
Installation
Verify the installation team’s licenses, relevant certifications, and insurance.
Commissioning & Handover
Confirm the testing records, monitoring access, warranty registration, and support included in the handover.
Service Areas
Customer Reviews
No reviews yet. Be the first to review Sundance Power Systems!
Frequently Asked Questions
How do I get a quote from Sundance Power Systems?
You can request a quote through the form on this page or contact Sundance Power Systems directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.
What areas does Sundance Power Systems serve?
Sundance Power Systems is based in Greenville and serves within a 120 km radius. Check the Service Areas section above for a complete list of locations.
What certifications does Sundance Power Systems hold?
This profile does not list independently verified certifications. Ask Sundance Power Systems for current license, insurance, and credential details, then confirm them with the relevant authority.
What warranty does Sundance Power Systems offer?
This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Sundance Power Systems for current written terms and exclusions.
How long does installation take?
The timeline is project- and jurisdiction-specific. Ask Sundance Power Systems for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.
Does Sundance Power Systems handle permits and paperwork?
The exact scope is not verified on this profile. Ask Sundance Power Systems which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.
Contact Information
Request a QuoteBusiness Details
About this profile
The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.
Request a Quote from Sundance Power Systems
Send your project details to request follow-up from Sundance Power Systems. Response timing and consultation terms are set by the company.
For Sundance Power Systems
Claim Your Free Profile
Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.
Sundance Power Systems