S

Suncatcher of Atlanta in Atlanta

Atlanta, Georgia·Solar Installation
ResidentialCommercial

43+ yrs

Experience

80 km

Service radius

1-10

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About Suncatcher of Atlanta

Atlanta's longest-operating solar company since 1983, specializing in solar electric, solar hot water, and solar pool heating systems

Atlanta, Georgia 30060

Atlanta, Georgia 30060

Services Offered

Solar InstallationBattery StorageSolar DesignMaintenance

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

BBB Accredited

Reported Equipment Brands

Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.

Panels

Qcells

Inverters

EnphaseSolarEdge

Batteries

Tesla Powerwall

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

12yr

Inverter Warranty

10yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

Atlanta, GeorgiaMarietta, GeorgiaKennesaw, GeorgiaRoswell, GeorgiaAlpharetta, GeorgiaSmyrna, GeorgiaWoodstock, GeorgiaAcworth, Georgia

Customer Reviews

No reviews yet. Be the first to review Suncatcher of Atlanta!

Write a Review

Frequently Asked Questions

How do I get a quote from Suncatcher of Atlanta?

You can request a quote through the form on this page or contact Suncatcher of Atlanta directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Suncatcher of Atlanta serve?

Suncatcher of Atlanta is based in Atlanta and serves within a 80 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Suncatcher of Atlanta hold?

This profile lists the following reported certifications: BBB Accredited. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does Suncatcher of Atlanta offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Suncatcher of Atlanta for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Suncatcher of Atlanta for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Suncatcher of Atlanta handle permits and paperwork?

The exact scope is not verified on this profile. Ask Suncatcher of Atlanta which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Social Media

Request a Quote

Business Details

Founded1983
Employees1-10
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Suncatcher of Atlanta

Send your project details to request follow-up from Suncatcher of Atlanta. Response timing and consultation terms are set by the company.

For Suncatcher of Atlanta

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
S

Suncatcher of Atlanta

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.