S

Sun Vault Roofing in Madison

Madison, Wisconsin·Solar Installation
Residential
0

80 km

Service radius

11-50

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About Sun Vault Roofing

Madison's first integrated solar roof installer specializing in CertainTeed Solstice solar shingles and premium roofing

Madison, Wisconsin 53719

Madison, Wisconsin 53719

Services Offered

Solar InstallationMaintenance

Reported Equipment Brands

Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.

Panels

CertainTeed Solstice

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

12yr

Inverter Warranty

10yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

Madison, WisconsinMiddleton, WisconsinSun Prairie, WisconsinFitchburg, WisconsinVerona, WisconsinWaunakee, Wisconsin

Customer Reviews

No reviews yet. Be the first to review Sun Vault Roofing!

Write a Review

Frequently Asked Questions

How do I get a quote from Sun Vault Roofing?

You can request a quote through the form on this page or contact Sun Vault Roofing directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Sun Vault Roofing serve?

Sun Vault Roofing is based in Madison and serves within a 80 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Sun Vault Roofing hold?

This profile does not list independently verified certifications. Ask Sun Vault Roofing for current license, insurance, and credential details, then confirm them with the relevant authority.

What warranty does Sun Vault Roofing offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Sun Vault Roofing for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Sun Vault Roofing for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Sun Vault Roofing handle permits and paperwork?

The exact scope is not verified on this profile. Ask Sun Vault Roofing which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Social Media

Request a Quote

Business Details

0
Employees11-50
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Sun Vault Roofing

Send your project details to request follow-up from Sun Vault Roofing. Response timing and consultation terms are set by the company.

For Sun Vault Roofing

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
S

Sun Vault Roofing

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.