S

Sun Power Energy in Colorado Springs

Colorado Springs, Colorado·Solar Installation
ResidentialCommercial

6+ yrs

Experience

80 km

Service radius

1-10

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About Sun Power Energy

Colorado Springs solar sales, installation, service, and repair specialists with franchise opportunities

Colorado Springs, Colorado 80920

Colorado Springs, Colorado 80920

Services Offered

Solar InstallationEV ChargingMaintenanceSolar Design

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

25yr

Inverter Warranty

10yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

Colorado Springs, ColoradoFountain, ColoradoSecurity-Widefield, ColoradoMonument, ColoradoBlack Forest, ColoradoPeyton, Colorado

Customer Reviews

No reviews yet. Be the first to review Sun Power Energy!

Write a Review

Frequently Asked Questions

How do I get a quote from Sun Power Energy?

You can request a quote through the form on this page or contact Sun Power Energy directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Sun Power Energy serve?

Sun Power Energy is based in Colorado Springs and serves within a 80 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Sun Power Energy hold?

This profile does not list independently verified certifications. Ask Sun Power Energy for current license, insurance, and credential details, then confirm them with the relevant authority.

What warranty does Sun Power Energy offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Sun Power Energy for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Sun Power Energy for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Sun Power Energy handle permits and paperwork?

The exact scope is not verified on this profile. Ask Sun Power Energy which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Social Media

Request a Quote

Business Details

Founded2020
Employees1-10
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Sun Power Energy

Send your project details to request follow-up from Sun Power Energy. Response timing and consultation terms are set by the company.

For Sun Power Energy

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
S

Sun Power Energy

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.